The most important projects

2015.

Hydroelectric plant on the river Govza- Foča
Works on assembly of the pipeline.
Value of execution works 560.000,00 KM.

Sisecam soda Lukavac l.t.d
Boiler assembly of 110t vapour per hour.
Value of executed works 677.445,00 KM.

 

2014.

Oil Rafinery Brod
Connection delivery pipelines to reservoir M-1.
Value of execution works 630.185,79 KM.

RiTe Ugljevik – Mine and Thermo Plant Ugljevik
Procurement services on replacement of the bearing elements of convective superheater.
Value of execution works 418.041,00 KM.

 

2013.

Thermal Power Plant Tuzla – Elektrical Industry Bosnia and Herzegovina
Assembly and dismantling of the economiser on the boiler 6 (block 5).
Value of execution works 1.134.315,00 KM.

Alumina Zvornik
Dismantling-assembly works on the boiler pipeline’s system number 3.
Value of execution works 476.784,00 KM.

 

2012.

„Energolinija“ Zvornik
Boiler reconstruction with purpose of fuel change from gaseous to solid fuel.
Value of execution works 360.000,00 KM

Thermal Power Plant Tuzla – Electrical Industry Bosnia and Herzegovina
Procurement armature with installation on the block 6 – 215 MW.
Value of execution works 575.020,09 KM.

Thermal Power Plant Gacko Mine and Thermo Plant Gacko
Replacement convective vorheater (KPP)
Value of execution works 742.500,00 KM.

 

2011.

Thermal Power Plant Kakanj
Reconstruction of the block 6.
Welded over 18.000 welds on the compressive part of the boiler. Dismantled 1.726.350 kg of boiler’s equipment, and attached 1.232.777 kg new boiler’s equipment compressive and uncompressive part of the boiler.
Value of execution works 645.576,46 KM.

Oil Rafinery Brod
Capital overhauls and reconstruction furnaces.
Works on preparation and elevation second, third and fourth section of convection coiled tube and consolidation of bearing construction of the carcose furnace 31-F-01 and section number 31.
Value of execution works 615.576,46 KM.

 

2010.

Thermal Power Plant Ugljevik
Boiler reconstruction.
Value of execution works 2.697.168,83 KM.

Thermal Plant Tuzla
Replacement economiser and steam superheater.
Value of execution works 813.150,00 KM.

 

2009.

Oil Rafinery Modriča
Revitalization Oil Rafinery Modriča

Hydroelectric Plant Trebišnjica Trebinje
Capital overhaul.
Value of execution works 165.750,00 KM.

Nuclear Power Plant Krško – Slovenia
Mechanical works on seizmic protection bridge project.
Value of execution works 77.968,80 KM.

 

2008.

Petrochemical complex Kiriš- Russian Federation
Contsruction furnace Reforming
Value of execution works 2.202.050,89 KM.

 

2007.

ArcelorMittal Zenica
Boiler reconstruction.
Value of execution works 1.094.445,30 KM.

Heating Plant Bosanski Brod
Construction of Heating Plant by system „key in hands“.
Value of execution works 2.641.958,35 KM.

 

2004.

Thermal Plant Gacko
Boiler reconstruction.
Value of execution works 1.594.360,00 KM.